Tuesday 16 May 2017

Rebuilding Gene Autry (final)

I've completed the wiring and done some test running, and I can now report that Gene Autry is again open for business.

Here's the revised track schematic diagram that will be installed in the fascia:


















The turnouts for the air base and the passing siding are located the wrong way around, in that the siding ended north (to the left) of the air base siding, but this arrangement gave me more room for the air base.

I still have to install the pushrods for the Peco points, and then wire power to their frogs. However, I've done some testing and the current situation does not present any problems for operation.

Regards,
Ron

No comments:

Post a Comment